Built by people who have built plants.
Text-only profiles. No portraits. Bios from project materials.
Our team combines factory construction, process engineering, water treatment, and quality control for LFP production. Profiles below are text only, from project materials.
Leadership
- John Wozniak — CEO. 25+ years developing battery pack technology. Technical background with extensive Asia manufacturing experience.
- Jack Wu — co-CEO. 25+ years in energy storage. PhD in electrical engineering. Experience building large production capacity; U.S.–China technology bridge.
- Andrew Yang — COO. 30+ years of Fortune 500 leadership. Supply chain expert in EV, battery technology, and green energy.
- David Howell — President. Domestic battery supply chain advocate. Energy sector expert.
- David Scoppa — Business Development. Expert in battery materials and recycling. Trading, negotiation, and project management.
- Steven TJ (ST) — CTO. 10+ years in the LFP industry. Led a 250,000-ton project and zero-waste initiatives. Factory construction to operation.
Engineering and operations
- Factory construction & management: Steven TJ (10+ yrs, led a 250,000-ton LFP project and 240,000-ton precursor projects); John HZ (14 yrs, planning and construction of multiple 250,000-ton precursor projects); Elon TT (11 yrs, equipment and pipeline construction).
- Process engineering: Richard WZT (14 yrs, LFP cathode production and process design); Emily C (16 yrs, LFP process design and optimization); Shawn W (6 yrs, full cycle of a 60,000-ton LFP project).
- Specialized engineering: David CJ (10 yrs, water treatment; led an industry-first iron phosphate wastewater zero-discharge system from R&D to operation); Philips CW (11 yrs, quality control; senior laboratory technician and quality engineer).
Team scale (project materials)
Approximately 150 production staff, 30 engineers, 20 R&D, 5 PhDs, 10 master’s degrees, 10 CNAS certifications. Certifications cited in materials: ISO 9001, ISO 14001, IATF 16949, UL, CE, RoHS.