Proposed Project

50,000 t/yr.
West Texas. Proposed.

A proposed LFP cathode plant — in planning, not built, not operating.

The proposed plant

Our proposed first plant in West Texas targets 50,000 tonnes per year of LFP cathode material. It is a proposed project — in planning, not built, not operating.

The site layout follows the two-stage process: a precursor hall (wet chemistry), a cathode hall (dry, high-temperature), and a utilities spine connecting them, plus raw-material receiving, warehousing, office, and lab space.

Project snapshot

Item Status
Target capacity 50,000 t/yr LFP cathode (proposed target)
Location West Texas, USA (proposed)
Stage 1 Iron phosphate precursor, ammonia route
Stage 2 LFP cathode: mix, sinter, mill, coat, pack
By-product Ammonium sulfate recovery
Water Zero liquid discharge (design intent)
Status Proposed — planning stage

Proposed vs. verified

From project materials: ammonia-route chemistry and stage order; 50,000 t/yr target; automation / robot transport; zero-discharge as a stated design goal.

Illustrative: building footprints, equipment sizes and counts, line counts, temperatures as project setpoints, recovery rates, yields, costs, and timelines.

Open questions (to be confirmed)

Number of lines and capacity per line; kiln setpoints and atmosphere control; whether precursor calcination is in the final design; lithium and carbon sources; wastewater volumes and MVR sizing; site layout and utilities capacities; legal review of customer wording.

Figure

Plant overview — site scale

Hover a block to read its readout. Proposed — Illustrative.

Fig 1 — Plant overview (site scale). Open full diagram →

Utilities + circular loop

Hover a block to read its readout. Proposed — Illustrative.

Fig 4 — Utilities + circular loop (loop scale). Open full diagram →